Podesite komoru — UKM VersatilePripremamo konfigurator… ← Back to UKM Versatile BASIC CONFIGURATION Chamber model Choose a model UKMV 1501UKMV 1502UKMV 1701UKMV 1702UKMV 2001UKMV 2002UKMV 2003UKMV 2004UKMV 2005UKMV 2006UKMV 2001×2UKMV 2002×2 Heating method Choose a heating method E – electric heating G – gas heating D – steam heating CHOOSE OPTIONAL EQUIPMENT 01Controls and automation SMART configurationIncludes pneumatic door opening, M2016 controller and signal light. SMART configuration for a pass-through chamberIncludes M2016 controller, pneumatic door opening, signal light and safety door interlock. M2016 touchscreen controller (upgrade from M2015)The upgrade includes removal of the standalone M2015 control panel. Additional M2015 control panelFor displaying values or controlling the chamber using both panels. Additional M2016 touchscreen control panelOne panel allows simultaneous control of up to six chambers. Removal of the M2016 control panel from the configurationFor controlling more chambers using fewer panels. VisuNET Premium licence for three computersExtended VisuNET licence for use on three computers. 02Cooling and air treatment Cold-smoking evaporator – 7.5 kW per trolleyCooling evaporator for cold-smoking processes, rated at 7.5 kW per trolley. Intensive cold-smoking evaporator – 15 kW per trolleyFor demanding cold-smoking processes and efficient moisture removal, especially with fish. ClimapacketIncludes a 4.5 kW per trolley cooling evaporator, additional electric heating and a frequency inverter. ShoweringAdds a product showering system inside the chamber. Frequency inverterAllows fan speed adjustment. Smoke catalystFor models where a catalyst is listed in the matrix; UKMV 2005 and 2006 require a smoke afterburner system. Smoke afterburner systemFor UKMV 2005 and 2006 instead of a catalyst; the solution is specified for the project. Extraction fanOptional for UKMV 1501, 1502, 1701, 1702, 2001 and 2002; included as standard on the other models offered. 03Construction, doors and installation Pass-through chamberAdds doors on both sides of the chamber for pass-through operation. Pass-through chamber for temperatures above 160 °CPass-through configuration for processes above 160 °C. Safety door interlock for a pass-through chamberPrevents simultaneous opening of doors on both sides of the chamber. Included in the SMART pass-through configuration. Signal light for a pass-through chamberThe signal light indicates the pass-through chamber’s operating status. Pneumatic door openingIncluded in the SMART configuration. Floor drainTwo drains are recommended for chambers holding six or more trolleys. Air compressorSupplies compressed air to the chamber’s pneumatic components. Chamber weldingThe welding scope and installation conditions are specified for the project. Smoke generator relocationFor moving the smoke generator away from the front of the chamber or feeding smoke from above. Pipework is specified for the project. Electrical cabinet relocationFor moving the electrical cabinet away from the front of the chamber or to a non-standard position. 100 mm panels with mineral wool fillingReplaces standard panels with 100 mm panels filled with mineral wool. Guillotine door on the front or rear panelAdds a guillotine door to the chamber’s front or rear panel. Door windowAdds a window for visual inspection inside the chamber. Increased floor load capacity up to 1,200 kg per trolleyLoad capacity depends on building conditions and specific requirements. 04Heating and steam Gas heat exchanger modification for temperatures above 110 °CFor models with gas heating (G). Gas heat exchanger modification for temperatures above 200 °CFor models with gas heating (G). Direct steam injectionIntroduces steam directly into the chamber during processing. Electric heating up to 160 °CFor chambers with electric heating (E). Electric heating up to 200 °CFor chambers with electric heating (E). Additional electric heating for a steam chamber (D) up to 160 °C – fully electric heatingFor steam chambers (D). Additional electric heating for a steam chamber (D) up to 200 °C – fully electric heatingFor steam chambers (D). Additional electric heating for a gas chamber (G) with cooling – 8 kW per trolleyFor gas chambers (G) equipped with a cooling system. Removal of steam group no. 1 from the configurationRemoves steam group no. 1 from the chamber’s basic configuration. Removal of steam group no. 2 from the configurationRemoves steam group no. 2 from the chamber’s basic configuration. 05Smoking system and liquid smoke Complete preparation for liquid smokeFully prepares the chamber for operation with liquid smoke. Preparation of openings for liquid smoke pipeworkPrepares openings for the liquid smoke system’s pipework. Tarber liquid smoke applicatorAdds a Tarber applicator for applying liquid smoke. Smoke pipework with washing systemAdds smoke pipework with an integrated washing system. Removal of the VK01 smoke generatorFor UKMV 1501, 1502, 1701, 1702, 2001 and 2002. Removal of the VK02 smoke generatorFor UKMV 2003, 2004 and 2002×2. Removal of the VK03 smoke generatorFor UKMV 2005 and 2006. Non-standard smoke generator – specified for the projectThe generator type is specified separately according to the required process. 06Washing and auxiliary equipment Additional washing trolleyFor UKMV 1501, 1502, 1701, 1702 and 2001. Removal of the washing trolley from the configurationFor UKMV 2002–2006, 2001×2 and 2002×2. Dosatron dosing pumpCan be combined with a washing trolley in a central washing system. YOUR CONFIGURATION Chamber modelNo model selected. Heating methodNo heating method selected. ✓Included as standard: VisuNET, multi-position airflow dampers No optional equipment selected. SENDING AN ENQUIRY SEND YOUR SELECTION TO OUR TEAM Your selected configuration will be added to a prepared email. Prices are not shown in the configurator. SEND AN ENQUIRY→