Podesite komoru — UKM CentralPripremamo konfigurator… ← Back to UKM Central BASIC CONFIGURATION Chamber model Choose a model UKM 2103 – 3 kolicaUKM 2104 – 4 kolicaUKM 2105 – 5 kolicaUKM 2106 – 6 kolicaUKM 2102×2 – 4 kolica, dvoredna konfiguracijaUKM 2103×2 – 6 kolica, dvoredna konfiguracijaUKM 2104×2 – 8 kolica, dvoredna konfiguracija Heating method Choose a heating method E – electric heating G – direct gas heating D – steam heating CHOOSE OPTIONAL EQUIPMENT 01Controls and automation SMART configurationIncludes pneumatic door opening, M2016 controller and signal light. SMART configuration for a pass-through chamberIncludes M2016 controller, pneumatic door opening, signal light and safety door interlock. M2016 touchscreen controller (upgrade from M2015)The upgrade includes removal of the standalone M2015 control panel. Additional M2015 control panelFor displaying values or controlling the chamber using both panels. Additional M2016 touchscreen control panelOne panel allows simultaneous control of up to six chambers. Removal of the M2016 control panel from the configurationFor controlling more chambers using fewer panels. VisuNET Premium licence for three computersExtended VisuNET licence for use on three computers. 02Cooling and air treatment Cold-smoking evaporator – 11 kW per trolleyCooling evaporator for cold-smoking processes, rated at 11 kW per trolley. ShoweringAdds a product showering system inside the chamber. Smoke catalystFor UKM 2103 and 2104. Other models require a smoke afterburner system. Smoke afterburner systemReplaces the catalyst on models 2105, 2106 and double-row chambers; specified for the project. 03Construction, doors and installation Pass-through chamberAdds doors on both sides of the chamber for pass-through operation. Safety door interlock for a pass-through chamberPrevents simultaneous opening of doors on both sides of the chamber. Included in the SMART configuration. Pneumatic door openingIncluded in the SMART configuration. Signal light for a pass-through chamberThe signal light indicates the pass-through chamber’s operating status. Floor drainTwo drains are recommended for chambers holding six or more trolleys. Air compressorSupplies compressed air to the chamber’s pneumatic components. Chamber weldingThe welding scope and installation conditions are specified for the project. Electrical cabinet relocationFor moving the electrical cabinet from the front of the chamber to another position. A separate electrical cabinet is designed individually. Smoke generator relocationFor moving the smoke generator away from the front of the chamber or feeding smoke from above. Pipework is specified for the project. 100 mm panels with mineral wool fillingFor UKM 2103, 2104 and 2102×2. Door windowAdds a window for visual inspection inside the chamber. Increased floor load capacity up to 1,200 kg per trolleyLoad capacity depends on building conditions and specific requirements. 04Heating and steam Heat exchanger for indirect gas heatingFor gas heating; flue gas exhaust pipework is not included in this item. Thermal insulation for hot-smoking equipmentAdds thermal insulation to equipment used for hot smoking. Electric heating up to 160 °CFor electrically heated UKM 2103, 2104 and 2102×2 chambers. Additional electric heating for a steam chamber (D) up to 160 °CFor UKM 2103, 2104 and 2102×2 steam chambers. Removal of steam group no. 1 from the configurationRemoves steam group no. 1 from the chamber’s basic configuration. Removal of steam group no. 2 from the configurationRemoves steam group no. 2 from the chamber’s basic configuration. 05Smoking system and liquid smoke Complete preparation for liquid smokeFully prepares the chamber for operation with liquid smoke. Preparation of openings for liquid smoke pipeworkPrepares openings for the liquid smoke system’s pipework. Tarber liquid smoke applicatorOn request for single-row models 2103, 2104, 2105 and 2106. Removal of the VK02 smoke generatorFor UKM 2103, 2104 and 2102×2. Removal of the VK03 smoke generatorFor UKM 2105, 2106, 2103×2 and 2104×2. Non-standard smoke generator – specified for the projectThe generator type is specified separately according to the required process. Smoke pipework with washing systemAdds smoke pipework with an integrated washing system. 06Washing and auxiliary equipment Removal of the washing trolley from the configurationFor UKM 2105, 2106, 2103×2 and 2104×2. Dosatron dosing pumpCan be combined with a washing trolley in a central washing system. YOUR CONFIGURATION Chamber modelNo model selected. Heating methodNo heating method selected. ✓Included as standard: VisuNET No optional equipment selected. SENDING AN ENQUIRY SEND YOUR SELECTION TO OUR TEAM Your selected configuration will be added to a prepared email. Prices are not shown in the configurator. SEND AN ENQUIRY→